1. Application Description 1) Service Description The base station commissioning indicates that the users commission and verify the base. OptiX RTN Radio Transmission System. VRC Commissioning and Configuration Guide (Web LCT). Issue, Date, HUAWEI. Huawei DBS Commissioning Procedure Security Level: Huawei DBS Commissioning Procedure (V) HUAWEI Confidential Page1.

Author: Basida Taurg
Country: Puerto Rico
Language: English (Spanish)
Genre: Video
Published (Last): 12 March 2014
Pages: 158
PDF File Size: 5.40 Mb
ePub File Size: 16.39 Mb
ISBN: 202-3-40467-130-4
Downloads: 99296
Price: Free* [*Free Regsitration Required]
Uploader: Kilkis

If you are a beginner or only need to commission the base station in a specific scenario, see the corresponding com,issioning base station quick commissioning guide. The Upgrade NodeB software dialog box will not be displayed.

RTN 950 V100R003C01 Commissioning and Configuration Guide 02(Web LCT)

After the upgrade the software is complete, system will automatically reset NodeB, this will take about huwei minutes. Click the […] button on the Office row. Call P Testing Then make Voice call and video call in each cell. Once the NodeB has reset the new configuration will take effect. Sub-contractor team got the correct NodeB software and Script from Huawei.

Application Description 1 Service Description The base station commissioning indicates that the users commission and verify the base station based on design requirements to ensure that the base station can work properly. The target software package has been obtained.

Click here to sign up. To finalize the commissioning of the NodeB and make it ready for call testing it is necessary to notify the RNC engineer that the software upgrade and the commissioning is complete. You need set IP Address is If it is not the right version, please do Item 10 Local Commissioning again. Login to site http: Make a PS download and walk around the commissloning, to make sure there is no call drop.

  BROTHER INTELLIFAX 1360 MANUAL PDF

Micro Base Station Commissioning Guide-Wireless Network Info Community-Huawei Connect

Compiling and Submitting the Site Documents Telus has some special sites, which are not defined like this, Huawei will provide a list of these kind of sites Enter the email address you signed up with and we’ll email you a reset link.

Connect laptop and NodeB with a Fast Ethernet cable. After the reset is complete, DBS runs normally, the status should now be: Site Access Procedures On attending site the engineer will be required to follow the site access procedures laid out below.

If the RNC engineer is not able to provide the necessary support the local engineer will need to contact Huawei technical support. If required the engineer may have to remain off site until tower crews have finished any ongoing operations. A valid Huawei ID card will be required for all engineers attending site. This report then provides the basis for scheduling activities for commissioning preparation and commissioning activities.

Commissioning Preparation In order for commissioning preparation to be considered complete the following must have happened.

Make a call and walk around the site, to make sure there is no call drop. The details of this process are not covered in this document and is only included for informational purposes.

From this report a forecasting schedule will then be produced to initiate the site configuration data to be hkawei and the scheduling of engineers to attend site for commissioning.

For different base station commissioning scenarios, the following methods can be used: Return New post Share. Core Network Info Community Members: Once you are logged in successfully you should see the following. This procedure must happen all the time, every bt. The RNC engineer will need to unlock the cells and load the appropriate license keys for the NodeB configuration. It will take about 10 minutes to activate the software.

  ABIES GUATEMALENSIS PDF

RTN VRC01 Commissioning and Configuration Guide 02(Web LCT) – Huawei

Initiate the internet connection and make sure connection is set up. The diagram below details the orientation of the Antennas, the first sector Alpha is the one orientating to the north east, alone the clockwise, are the second Beta and the third Gamma sector.

Please wait minutes. The engineer will need to resolve or account for any active alarms on the NodeB with the assistance of the RNC engineers and Huawei technical support.

The DBS will carry out a reset after the software and the data configuration has been activated. Once the downloading of the software and configuration to the DBS begins the following should be occurring: To do this the engineer will need to us a compass to find orientate the direction of the sectors and then brs the Cell ID and scrambling codes for each antenna.

Use the [Browse] button to set the location of the configuration file NodeBCfg. Wireless Network Info Community Members: Please refer to the document: Then double-click Data Config File Transfer. Save it and send all these three files to Huawei. Help Center Find new research papers in: